• 2024 Prefab Prefabricated Industrial Factory Project Storage/Hangar Metal Frame Construction Structure Warehouse Steel Building for Export Installation
  • 2024 Prefab Prefabricated Industrial Factory Project Storage/Hangar Metal Frame Construction Structure Warehouse Steel Building for Export Installation
  • 2024 Prefab Prefabricated Industrial Factory Project Storage/Hangar Metal Frame Construction Structure Warehouse Steel Building for Export Installation
  • 2024 Prefab Prefabricated Industrial Factory Project Storage/Hangar Metal Frame Construction Structure Warehouse Steel Building for Export Installation
  • 2024 Prefab Prefabricated Industrial Factory Project Storage/Hangar Metal Frame Construction Structure Warehouse Steel Building for Export Installation
  • 2024 Prefab Prefabricated Industrial Factory Project Storage/Hangar Metal Frame Construction Structure Warehouse Steel Building for Export Installation

2024 Prefab Prefabricated Industrial Factory Project Storage/Hangar Metal Frame Construction Structure Warehouse Steel Building for Export Installation

After-sales Service: Erection Instruction
Connection Form: Bolt Connection
Feature: Anti-Corrosion, Earthquake Resistance, Easy To Install, High Intensity, Recyclable
Install: Support Installation
Treatment: Epoxy Painting
Secondary Frame: Galvanized Steel Purlin
Samples:
US$ 100/Set 1 Set(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Guangdong, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (23)
  • Overview
  • Brief Instroduction
  • Steel Structure Advantages
  • Main Materials Information
  • The Whole Processing
  • Steel Parts Show On Drawing
  • Each Steel Parts and Accessory
  • Application
  • Factory Show
Overview

Basic Info.

Model NO.
HF0605
Leadtime
30 Days
Transportation
40hq, 40ot, Bulk Ship
Bracing
Steel Pipe, Rod
Design Software
Auto-CAD, Pkpm, Tekla
Standard
GB, ASTM, DIN, JIS, AISI, BS
Type of Steel for Building Structure
High-Strength Steel
Residential Wall Structure
Wallboard
Application
Steel Workshop, Steel Structure Platform
Warranty
50-Year Service Life
Type
Hot-Formed Steel
Forming
Welding
Member
Any Type Steel
Carbon Structural Steel
Q355b/Q235B/S275/S355
Transport Package
Bare Packing
Specification
H350*300
Trademark
HONGFA, Q355B/Q235B/S275/S355
Origin
China
HS Code
7308900000
Production Capacity
5000ton/Month

Product Description

Brief Instroduction
 

Our premium steel structure materials include an array of high-performance components such as H section steel, box section steel, and X-crossing section steel, forming the robust main steel framework. Complementing this are Z section steel, C section steel, L section steel, and U-section steel that constitute an efficient secondary system.The roof and walls feature versatile steel panels or lightweight cement bricks, providing both strength and aesthetic flexibility.

Steel Structure Advantages
 

1- Short Construction Time and High Efficiency

With all steel parts prefabricated in our factory workshop, on-site construction becomes remarkably swift. This significantly shortens the overall project timeline, enabling quicker utilization and faster return on investment.

2- Safe, Reliable, and Unbreakable
Utilizing high-quality steel with exceptional strength, coupled with intelligent structural design, ensures our buildings withstand typhoons, earthquakes, and other extreme conditions, guaranteeing maximum safety and durability.

3- Wide Range of Applications
Our prefabricated structural sections are highly versatile. They can be shaped and clad with various materials to suit any architectural requirement.Ideal for industrial, commercial, and civil buildings, as well as numerous public facilities.

4- Environmentally Friendly and Recyclable
All our steel materials are recyclable, ensuring they do not harm the natural environment.
Main Materials Information
 

Details of Steel Structure Main Materials:

Main Structure   Column Q235B, Q355B H section steel / Truss Section
  Beam Q235B, Q355B H section steel / Truss Section
Secondary Structure   Purlin Q235B, Q355B, G450 C and Z purlin
  Knee Brace Q235B Angle Steel
  Tie Rod Q235B Circular Steel Pipe
  Brace Q235B Round Bar
Vertical and Horizontal  Bracing Q235B Angle Steel, Round Bar or Steel Pipe
Claddy System   Roof Panel Sandwich Panel & Corrugated Steel Sheet
  Wall Panel Sandwich Panel & Corrugated Steel Sheet
Trims Color steel Sheet
Gutter Color steel Sheet, Galvanized Steel, Stainless Steel
Accessories   Window Aluminium Alloy, PVC, etc
  Door Sliding Sandwich Panel Door / Rolling Metal Door /  Personal Door
  Rainspout PVC Pipe
Fastener System Anchor bolt Q235B, Q355B Round Bar
Bolt 10.9S, 8.8S High Strength, 4.6C Ordinary Bolt, Self-tapping Screw
Live load on Roof In 120kg/Sq.m (Color steel panel surrounded)
Wind Resistance Grade 12 Grades
Earthquake-resistance 8 Grades
Structure Usage Up to 50 years
Finishing Options Vast array of colors and textures available
Treatment Options Painting or Hot-dip galvanized
 
The Whole Processing
 

Step-by-step processing details when placing an order:

2024 Prefab Prefabricated Industrial Factory Project Storage/Hangar Metal Frame Construction Structure Warehouse Steel Building for Export Installation
Steel Parts Show On Drawing
 

Detailed representation of each steel part in the drawings:

2024 Prefab Prefabricated Industrial Factory Project Storage/Hangar Metal Frame Construction Structure Warehouse Steel Building for Export Installation
Each Steel Parts and Accessory

2024 Prefab Prefabricated Industrial Factory Project Storage/Hangar Metal Frame Construction Structure Warehouse Steel Building for Export Installation
Application
 

Our steel structures offer a modern solution for industrial buildings, residential homes, commercial spaces, airports, train stations, and other public steel structures.

2024 Prefab Prefabricated Industrial Factory Project Storage/Hangar Metal Frame Construction Structure Warehouse Steel Building for Export Installation
Factory Show

2024 Prefab Prefabricated Industrial Factory Project Storage/Hangar Metal Frame Construction Structure Warehouse Steel Building for Export Installation2024 Prefab Prefabricated Industrial Factory Project Storage/Hangar Metal Frame Construction Structure Warehouse Steel Building for Export Installation2024 Prefab Prefabricated Industrial Factory Project Storage/Hangar Metal Frame Construction Structure Warehouse Steel Building for Export Installation
Q & A

---What can our products be used for?
Our products are perfect for warehouses, workshops, storage sheds, schools, hangars, commercial buildings, high-rise structures, and more.

---What is the delivery time?
Typically, delivery occurs within 45 days for up to 300 tons, once all drawings are confirmed.

---What are the payment terms?
A 30% deposit via TT upon contract signing, with the remaining 70% payable by TT before shipment against the final production materials list.

---How is shipping handled?
We generally use 40HQ or 40OT containers for shipping.

---How about the erection process?
We can provide 1 or 2 engineers to supervise the erection process, if needed.

---Do you supply other products?
Yes, we offer a wide range of steel frame products, including roofing sheets, wall panels, cranes, doors, windows, downpipes, and various accessories.

Client Visits :
 
2024 Prefab Prefabricated Industrial Factory Project Storage/Hangar Metal Frame Construction Structure Warehouse Steel Building for Export Installation

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory
Number of Employees
290
Year of Establishment
2001-10-18