Fast Build Hall Prefabricated Steel Structure Construction High Buliding Car Parking Builiding

Product Details
Customization: Available
After-sales Service: Erection Instruction
Treatment: Painting or Hot-DIP Galvanized
Still deciding? Get samples of US$ 100/Set
Request Sample
Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (23)
  • Fast Build Hall Prefabricated Steel Structure Construction High Buliding Car Parking Builiding
  • Fast Build Hall Prefabricated Steel Structure Construction High Buliding Car Parking Builiding
  • Fast Build Hall Prefabricated Steel Structure Construction High Buliding Car Parking Builiding
  • Fast Build Hall Prefabricated Steel Structure Construction High Buliding Car Parking Builiding
  • Fast Build Hall Prefabricated Steel Structure Construction High Buliding Car Parking Builiding
  • Fast Build Hall Prefabricated Steel Structure Construction High Buliding Car Parking Builiding
Find Similar Products
  • Overview
  • Brief Instroduction
  • Steel Structure Advantages
  • Main Materials Information
  • The Whole Processing
  • Steel Parts Show On Drawing
  • Each Steel Parts and Accessory
  • Application
  • Factory Show
Overview

Basic Info.

Model NO.
HF0022
Floor
Galvanized Steel Floor Decking
Leadtime
20 Days
Transportation
40hq, 40ot, Bulk Ship
Partition Wall
Glass Curtain
Design Software
Auto-CAD, Pkpm, Tekla
Main Wall
Light Bricks
Stairs
Steel Stairs
Standard
GB, ASTM, DIN, JIS, AISI, BS
Connection Form
Bolt Connection
Type of Steel For Building Structure
High-Strength Steel
Residential Wall Structure
Wallboard
Application
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Steel Structure Bridge
Warranty
50-Year Service Life
Type
Hot-Formed Steel
Steel Type
Q355b/Q235B/S275/S355
Forming
Welding
Member
Any Type Steel
Carbon Structural Steel
Q355b/Q235B/S275/S355
Transport Package
Bare Packing
Specification
Box 400*400
Trademark
HONGFA
Origin
China
HS Code
7308900000
Production Capacity
5000ton/Month

Product Description

   
Brief Instroduction

    Steel structure materials are included H section steel, box section steel, X-crossing section steel as the building's main steel framework, and Z section steel, C section steel, L section steel, U -section steel as its secondary system, Roof and walls using a variety of steel panels or light cement bricks.

 
Steel Structure Advantages

1- Short time and high efficiency

    All the steel parts can be pre-fabricated at the factory workshop, So they are super-quick to build at site. Shorten the construction time of the entire project, which can be put into use faster and produce benefits.

2- Safe and Reliable and Unbreakable
    High strength of high-quality steel materials, integration of reasonable building structure design make the whole building is protected from damage in typhoon zones, earthquake zones and other harsh environments.

3- Wide range of application
   Ready-made structural sections are available. They can be made to take any kind of shape, and clad with any type of material. Use to Industrial, commercial, civil buildings , and many public building facilities

4- Environmentally, Friendly, Recyclable
    All steel materials can be used and will not cause damage to the natural environment.

 
Main Materials Information

Steel Structure Main Materials Information:

 
Main Structure   Column Q235B, Q355B H section steel / Truss Section
  Beam Q235B, Q355B H section steel / Truss Section
Secondary Structure   Purlin Q235B, Q355B, G450 C and Z purlin
  Knee Brace Q235B Angle Steel
  Tie Rod Q235B Circular Steel Pipe
  Brace Q235B Round Bar
Vertical and Horizontal  Bracing Q235B Angle Steel, Round Bar or Steel Pipe
Claddy System   Roof Panel Sandwich Panel & Corrugated Steel Sheet
  Wall Panel Sandwich Panel & Corrugated Steel Sheet
Trims Color steel Sheet
Gutter Color steel Sheet, Galvanized Steel, Stainless Steel
Accessories   Window Aluminium Alloy, PVC, etc
  Door Sliding Sandwich Panel Door / Rolling Metal Door /  Personal Door
  Rainspout PVC Pipe
Fastener System Anchor bolt Q235B, Q355B Round Bar
Bolt 10.9S, 8.8S High Strength, 4.6C Ordinary Bolt, Self-tapping Screw
Live load on Roof In 120kg/Sq.m (Color steel panel surrounded)
Wind Resistance Grade 12 Grades
Earthquake-resistance 8 Grades
Structure Usage Up to 50 years
Finishing Options Vast array of colors and textures available
Treatment Options Painting or Hot-dip galvanized
 
The Whole Processing

The whole processing when placing the order:


Fast Build Hall Prefabricated Steel Structure Construction High Buliding Car Parking Builiding
Steel Parts Show On Drawing

Show each steel parts on drawings in details:


Fast Build Hall Prefabricated Steel Structure Construction High Buliding Car Parking Builiding
Each Steel Parts and Accessory

 

Fast Build Hall Prefabricated Steel Structure Construction High Buliding Car Parking Builiding
Application

     Steel structure is a new type of building structure system for industrial buildings, residential houses, commercial buildings, air-port buildings, train station buildings and other public steel buildings, etc.


Fast Build Hall Prefabricated Steel Structure Construction High Buliding Car Parking Builiding


 
Factory Show

 

Fast Build Hall Prefabricated Steel Structure Construction High Buliding Car Parking Builiding
Fast Build Hall Prefabricated Steel Structure Construction High Buliding Car Parking Builiding
Fast Build Hall Prefabricated Steel Structure Construction High Buliding Car Parking Builiding
Q & A

---What do our products can for?

Our products can do warehouse, workshop, storage shed, school, hanger shed, commercial building, high rise building, etc.

---How long can delivery?
Normally it needs around 45 days within 300 Tons when all drawing is confirmed.

---What's the payment term?
30% deposit by TT when signing contract, 70% balance be paid by TT before shipment against final production material list.

---How to ship to job site?
Normally we use 40HQ, or 40OT.

---How about the erection?
We can provide 1 or 2 engineer supervise your erection if you need.

---Any others products can be supply?
All products about steel frame can be supplied, such as roofing sheet, wall panel, crane, door, window, down pipe and some accessories.

Clients visiting:

Fast Build Hall Prefabricated Steel Structure Construction High Buliding Car Parking Builiding




 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier