• Steel Construction Workshop and Warehouse Leadtime 25 Days
  • Steel Construction Workshop and Warehouse Leadtime 25 Days
  • Steel Construction Workshop and Warehouse Leadtime 25 Days
  • Steel Construction Workshop and Warehouse Leadtime 25 Days
  • Steel Construction Workshop and Warehouse Leadtime 25 Days
  • Steel Construction Workshop and Warehouse Leadtime 25 Days

Steel Construction Workshop and Warehouse Leadtime 25 Days

Type: Hot-Formed Steel
Treatment: Epoxy Painting
Secondary Frame: Galvanized Steel Purlin
Leadtime: 25 Days
Transportation: 40hq, 40ot, Bulk Ship
Trim: Color Steel
Samples:
US$ 100/Set 1 Set(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Guangdong, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (23)
  • Overview
  • Brief Instroduction
  • Steel Structure Advantages
  • Main Materials Information
  • The Whole Processing
  • Steel Parts Show On Drawing
  • Each Steel Parts and Accessory
  • Application
  • Factory Show
Overview

Basic Info.

Model NO.
HF0053
Design Software
Auto-CAD, Pkpm, Tekla
Wall
Corrugated Steel Sheets
Roofing
Color Steel Sheets
Application
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Steel Structure Bridge
Standard
GB, ASTM, DIN, JIS, AISI, BS
Connection Form
Bolt Connection
Type of Steel For Building Structure
High-Strength Steel
Residential Wall Structure
Wallboard
After-sales Service
Erection Instruction
Warranty
50-Year Service Life
Trademark
Q355b/Q235B, HONGFA
Forming
Welding
Member
Any Type Steel
Carbon Structural Steel
Q355b/Q235B
Transport Package
Bare Packing
Specification
H300*200
Origin
China
HS Code
7308900000
Production Capacity
5000ton/Month

Product Description

Brief Instroduction



Steel Structure Materials by Dongguan Hongfa Steel Structure Mats .Co., Ltd.



 

Steel Structure Materials

 

Dongguan Hongfa Steel Structure Mats .Co., Ltd. offers a wide range of steel structure materials for building construction:



 

Main Steel Framework:

 

  • H section steel

  • Box section steel

  • X-crossing section steel


  •  


 

Secondary System:

 

  • Z section steel

  • C section steel

  • L section steel

  • U-section steel


  •  


 

Roof and Walls:

 

Our steel structure materials can be used for roofs and walls, utilizing various steel panels or light cement bricks for durability and strength.




 
Steel Structure Advantages


Steel Structure Buildings by Dongguan Hongfa Steel Structure Mats .Co., Ltd.



 

Steel Structure Buildings



 

Experience the efficiency and reliability of our steel structure buildings by Dongguan Hongfa Steel Structure Mats .Co., Ltd.



 

  • Short time and high efficiency: All steel parts are pre-fabricated at the factory workshop for quick on-site assembly, reducing construction time and allowing for faster utilization and benefits.



  •  
  • Safe, Reliable, and Unbreakable: High-quality steel materials and a well-designed structure ensure protection against damage in harsh environments like typhoon and earthquake zones.



  •  
  • Wide range of applications: Ready-made structural sections can be customized into various shapes and clad with different materials, suitable for industrial, commercial, civil, and public building facilities.



  •  
  • Environmentally Friendly and Recyclable: Our steel materials are eco-friendly and recyclable, ensuring minimal impact on the natural environment.


  •  


 

Contact Dongguan Hongfa Steel Structure Mats .Co., Ltd. today to explore the possibilities of steel structure buildings for your next project.




 
Main Materials Information

Discover top-quality steel construction workshops and warehouses by Dongguan Hongfa Steel Structure Mats. Co., Ltd. Fast lead time of 25 days. Perfect for industrial needs.

 
Main Structure   Column Q235B, Q355B H section steel / Truss Section
  Beam Q235B, Q355B H section steel / Truss Section
Secondary Structure   Purlin Q235B, Q355B, G450 C and Z purlin
  Knee Brace Q235B Angle Steel
  Tie Rod Q235B Circular Steel Pipe
  Brace Q235B Round Bar
Vertical and Horizontal  Bracing Q235B Angle Steel, Round Bar or Steel Pipe
Claddy System   Roof Panel Sandwich Panel & Corrugated Steel Sheet
  Wall Panel Sandwich Panel & Corrugated Steel Sheet
Trims Color steel Sheet
Gutter Color steel Sheet, Galvanized Steel, Stainless Steel
Accessories   Window Aluminium Alloy, PVC, etc
  Door Sliding Sandwich Panel Door / Rolling Metal Door /  Personal Door
  Rainspout PVC Pipe
Fastener System Anchor bolt Q235B, Q355B Round Bar
Bolt 10.9S, 8.8S High Strength, 4.6C Ordinary Bolt, Self-tapping Screw
Live load on Roof In 120kg/Sq.m (Color steel panel surrounded)
Wind Resistance Grade 12 Grades
Earthquake-resistance 8 Grades
Structure Usage Up to 50 years
Finishing Options Vast array of colors and textures available
Treatment Options Painting or Hot-dip galvanized
 
The Whole Processing

Order processing for Steel Construction Workshop and Warehouse by Dongguan Hongfa Steel Structure Mats Co., Ltd. with a lead time of 25 days.

Steel Construction Workshop and Warehouse Leadtime 25 Days
Steel Parts Show On Drawing
Show detailed drawings of steel parts for Steel Construction Workshop and Warehouse by Dongguan Hongfa Steel Structure Mats Co., Ltd. Leadtime: 25 days.
Steel Construction Workshop and Warehouse Leadtime 25 Days
Each Steel Parts and Accessory
Steel Construction Workshop and Warehouse Leadtime 25 Days
Application

Welcome to Dongguan Hongfa Steel Structure Mats .Co., Ltd.

 

Our steel structure system is revolutionizing the construction industry. Whether you need a sturdy industrial building, a modern residential house, a sleek commercial building, or a functional airport or train station building, our steel structures are the perfect solution.

 

With our innovative steel structure system, you can enjoy unparalleled strength, durability, and versatility in your construction projects. Say goodbye to traditional building methods and embrace the future of construction with Dongguan Hongfa Steel Structure Mats .Co., Ltd.

Steel Construction Workshop and Warehouse Leadtime 25 Days


 
Factory Show
Steel Construction Workshop and Warehouse Leadtime 25 Days
Steel Construction Workshop and Warehouse Leadtime 25 Days
Steel Construction Workshop and Warehouse Leadtime 25 Days
Steel Construction Workshop and Warehouse Leadtime 25 Days


Product Description


 

Welcome to Dongguan Hongfa Steel Structure Mats .Co., Ltd.

 

Product Description

 

Our steel structure products are versatile and suitable for various applications including warehouses, workshops, storage sheds, schools, hanger sheds, commercial buildings, and high-rise buildings.

 

Frequently Asked Questions

 

  1. What can our products do for you?
    Our products can cater to a wide range of needs in different sectors.

  2. How long is the delivery time?
    Typically, delivery takes around 45 days for orders up to 300 tons once all drawings are confirmed.

  3. What are the payment terms?
    30% deposit by TT is required when signing the contract, with the remaining 70% balance to be paid by TT before shipment against the final production material list.

  4. How are products shipped to the job site?
    We usually use 40HQ or 40OT containers for shipping.

  5. Do you provide erection services?
    We offer the option of having 1 or 2 engineers supervise the erection process if needed.

  6. What other products can be supplied?
    We can provide a range of steel frame products, including roofing sheets, wall panels, cranes, doors, windows, downpipes, and various accessories.


  7.  
 

Clients Visiting

 

For clients visiting our company, we ensure a warm welcome and professional service to meet your needs.




Steel Construction Workshop and Warehouse Leadtime 25 Days



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory
Number of Employees
290
Year of Establishment
2001-10-18