• Steel Frame High Rise Building Construction High Rise Prefabricated Industrial Workshop/Warehouse Building Frame Construction Hotel Steel Structure
  • Steel Frame High Rise Building Construction High Rise Prefabricated Industrial Workshop/Warehouse Building Frame Construction Hotel Steel Structure
  • Steel Frame High Rise Building Construction High Rise Prefabricated Industrial Workshop/Warehouse Building Frame Construction Hotel Steel Structure
  • Steel Frame High Rise Building Construction High Rise Prefabricated Industrial Workshop/Warehouse Building Frame Construction Hotel Steel Structure
  • Steel Frame High Rise Building Construction High Rise Prefabricated Industrial Workshop/Warehouse Building Frame Construction Hotel Steel Structure
  • Steel Frame High Rise Building Construction High Rise Prefabricated Industrial Workshop/Warehouse Building Frame Construction Hotel Steel Structure

Steel Frame High Rise Building Construction High Rise Prefabricated Industrial Workshop/Warehouse Building Frame Construction Hotel Steel Structure

After-sales Service: Erection Instruction
Connection Form: Bolt Connection
Feature: Anti-Corrosion, Earthquake Resistance, Easy To Install, High Intensity, Recyclable
Install: Support Installation
Treatment: Painting or Hot-DIP Galvanized
Floor: Galvanized Steel Floor Decking
Samples:
US$ 100/Set 1 Set(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Guangdong, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (23)
  • Overview
  • Brief Instroduction
  • Steel Structure Advantages
  • Main Materials Information
  • The Whole Processing
  • Steel Parts Show On Drawing
  • Each Steel Parts and Accessory
  • Application
  • Factory Show
Overview

Basic Info.

Model NO.
HF0661
Leadtime
20 Days
Partition Wall
Sandwich Panel
Design Software
Auto-CAD, Pkpm, Tekla
Standard
GB, ASTM, DIN, JIS, AISI, BS
Type of Steel for Building Structure
High-Strength Steel
Residential Wall Structure
Wallboard
Application
Steel Workshop, Steel Structure Platform
Warranty
50-Year Service Life
Type
Hot-Formed Steel
Forming
Welding
Member
Any Type Steel
Carbon Structural Steel
Q355b/Q235B/S275/S355
Transport Package
Bare Packing
Specification
Box 400*400
Trademark
HONGFA, Q355b/Q235B
Origin
China
HS Code
7308900000
Production Capacity
5000ton/Month

Product Description

Brief Instroduction
 

Our steel structure materials include H section steel, box section steel, and X-crossing section steel serving as the main steel framework. Secondary systems comprise Z section steel, C section steel, L section steel, and U-section steel for a robust and versatile construction solution.Roof and walls are constructed using a variety of steel panels or lightweight cement bricks, ensuring durability and strength.

Steel Structure Advantages
 

1- Short construction time with high efficiency

All steel parts are pre-fabricated in the factory workshop, allowing for super-quick assembly on-site. This significantly reduces the overall construction time, enabling the project to be put into use faster and achieve operational benefits sooner.

2- Safe, Reliable, and Unbreakable
The high strength of premium-quality steel materials, combined with an intelligently designed building structure, protects the entire edifice from damage in typhoon zones, earthquake zones, and other extreme environments.

3- Wide application range
Pre-fabricated structural sections are versatile and can be shaped to fit any design. They can be clad with various materials, offering limitless architectural possibilities.Ideal for industrial, commercial, civil buildings, and numerous public building facilities.

4- Environmentally Friendly and Recyclable
All steel materials are recyclable and eco-friendly, promoting sustainability without harming the natural environment.
Main Materials Information
 

Comprehensive Main Materials Information for Steel Structures:

Main Structure   Column Q235B, Q355B H section steel / Truss Section
  Beam Q235B, Q355B H section steel / Truss Section
Secondary Structure   Purlin Q235B, Q355B, G450 C and Z purlin
  Knee Brace Q235B Angle Steel
  Tie Rod Q235B Circular Steel Pipe
  Brace Q235B Round Bar
Vertical and Horizontal  Bracing Q235B Angle Steel, Round Bar or Steel Pipe
Claddy System   Roof Panel Sandwich Panel & Corrugated Steel Sheet
  Wall Panel Sandwich Panel & Corrugated Steel Sheet
Trims Color steel Sheet
Gutter Color steel Sheet, Galvanized Steel, Stainless Steel
Accessories   Window Aluminium Alloy, PVC, etc
  Door Sliding Sandwich Panel Door / Rolling Metal Door /  Personal Door
  Rainspout PVC Pipe
Fastener System Anchor bolt Q235B, Q355B Round Bar
Bolt 10.9S, 8.8S High Strength, 4.6C Ordinary Bolt, Self-tapping Screw
Live load on Roof In 120kg/Sq.m (Color steel panel surrounded)
Wind Resistance Grade 12 Grades
Earthquake-resistance 8 Grades
Structure Usage Up to 50 years
Finishing Options Vast array of colors and textures available
Treatment Options Painting or Hot-dip galvanized
 
The Whole Processing
 

Complete process overview for placing orders:

Steel Frame High Rise Building Construction High Rise Prefabricated Industrial Workshop/Warehouse Building Frame Construction Hotel Steel Structure
Steel Parts Show On Drawing
 

Detailed representation of each steel part on drawings:

Steel Frame High Rise Building Construction High Rise Prefabricated Industrial Workshop/Warehouse Building Frame Construction Hotel Steel Structure
Each Steel Parts and Accessory

Steel Frame High Rise Building Construction High Rise Prefabricated Industrial Workshop/Warehouse Building Frame Construction Hotel Steel Structure
Application
 

Steel structure is a revolutionary building system ideal for industrial buildings, residential houses, commercial buildings, airport facilities, train stations, and other public steel edifices.

Steel Frame High Rise Building Construction High Rise Prefabricated Industrial Workshop/Warehouse Building Frame Construction Hotel Steel Structure
Factory Show

Steel Frame High Rise Building Construction High Rise Prefabricated Industrial Workshop/Warehouse Building Frame Construction Hotel Steel StructureSteel Frame High Rise Building Construction High Rise Prefabricated Industrial Workshop/Warehouse Building Frame Construction Hotel Steel StructureSteel Frame High Rise Building Construction High Rise Prefabricated Industrial Workshop/Warehouse Building Frame Construction Hotel Steel Structure
Q & A

---What can our products be used for?
Our products are ideal for warehouses, workshops, storage sheds, schools, hangars, commercial buildings, high-rise buildings, and more.

---How long is the delivery time?
Typically, it takes around 45 days for orders within 300 tons once all drawings are confirmed.

---What are the payment terms?
A 30% deposit via TT when signing the contract, with the remaining 70% payable via TT before shipment against the final production material list.

---How will the goods be shipped to the job site?
We usually ship using 40HQ or 40OT containers.

---What about erection assistance?
We can provide one or two engineers to supervise the erection process if needed.

---Are there any additional products available?
We supply a range of steel frame products including roofing sheets, wall panels, cranes, doors, windows, downpipes, and other accessories.

Clients Visiting :
 
Steel Frame High Rise Building Construction High Rise Prefabricated Industrial Workshop/Warehouse Building Frame Construction Hotel Steel Structure

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory
Number of Employees
290
Year of Establishment
2001-10-18